Before Pics
Showing posts with label home project. Show all posts
Showing posts with label home project. Show all posts
Tuesday, August 11, 2009
Never buy a house at a fire sale.
With the previous tenants moving out at the end of May, graduating, job moves, etc, my old home near USF was empty for the first time since I moved there in almost 12 years. I decided to take the time to remodel it a but and update things before getting new tenants for the Fall semester. Since this was before I got my full-time job in June, I had a little time. After the job, I had to come over early in the morning or on weekends. The first order of business was to get rid of all the old carpet upstairs. Putting down new carpet would be cheaper, but then I'd have to do the same thing again in another few years of constant use, so I decided to just replace it all with tile. Once I got the carpet off the stairs to replace with wood laminate flooring, I saw how bad a condition they were. So at that point the project got even more complicated when I decided to completely replace the stairs and just stain them. This was a major PITA and I had to hire a carpenter friend for some of the finer points or measuring, cutting, and placement, but I think the end result came out well. I repainted all the bedrooms, fixed holes in the wall, replaced all the old windows with new energy efficient ones, cut up and removed the old hot tub (I needed the parts for the hot tub at my current home and honestly didn't want to deal with the liability and maintenance any more), landscaped the yard, replaced the toilet with an efficient dual-flush model, and numerous other little fixes. I was finally able to get everything finished and cleaned up the morning the first new tenant came it. Though it sucked to not have the income for the summer, I think the place looks a lot better and can be a good home environment (and rental producer) for many more years.







Sunday, June 07, 2009
Falling in love is easy; climbing out is a pain
After running 7 straight miles yesterday, a personal record for a single running distance in one stint, I decided to physically punish myself a bit more by joining the Tampa Adventure Group for the monthly meetup at the Vertical Ventures indoor climbing area. It had been a long, long time since I had been here, so I really had to dig to find my old harness. Most of the participants had never been climbing, so they took the class that "showed them the ropes" regarding safety and technique. It is amazing how just an hour or so of climbing can deaden one's arms; well at least my own. After the climbs, I had to visit a few tile and flooring places so I could find the materials I needed for the remodeling project and finally purchase everything and get it loaded. I finally got everything unloaded at the house (I don't even want to think how much 580 ft^3 of tile with the accompanying cement board, thin-set bags, and grout may weigh). Guess I know what I'll be doing over the next few weeks, but it'll be nice to have a decent house available for rent once again.


Sunday, April 19, 2009
Every man reaps what he sows, except the amateur gardener.
I decided to try putting in a summer garden since it had been many years since I last had something set up. I spent part of the afternoon clearing out the sunny spots in front of the garage and pulling out old elephant ear plants and a few shriveled up pineapple plants that never really produced much. I put down some old window screen to hopefully make the weeding more manageable and hope that I can remember to keep them watered. I'll probably hit Home Depot on the way home and pick up an automatic water timer and hope it can do some good. If things work out, then by the middle of June I should have tomatoes (large and even cherry size), cucumbers, and bell peppers.
If things don't work out I'll put in a Japanese rock garden since I don't think I'll be able to kill that.
If things don't work out I'll put in a Japanese rock garden since I don't think I'll be able to kill that.
Wednesday, April 15, 2009
I don't know if we'll ever cure proverty, but the way prices and taxes are going we're sure to cure wealth.
I finally got my taxes finished last night at 3AM and am glad to have been able to catch up on one of my biggest, 'need to do' items on my list. I'd let a lot of things lapse over the years, so it was good to have this beast finished. I was even able to get in my maximum $5000 IRA contribution (money I won't see again for 35 years but helps save a good bit in current taxes) set up at my new favorite banking institution, Pentagon Federal Credit Union. Not only did they have about the best current rates on CDs, but I also just picked up a credit card through them that has the best cash rewards program right now. My old Citibank dividend credit card simply gave me a basic 1% cash back on my purchases, however I had to wait until $50 worth of rewards accrued before I could request a check. This new card not only provides 5% back in gas purchases (saving about 11 cents a gallon at current prices) but also 2% in grocery store and drugstore purchases and 1.25% on all other purchases. The nice part is that the cash back is applied to the credit card balance every month, so I don't have to wait any period of time to get the benefit.Over the past couple of weeks I have been busting out the home cleaning and repair projects that have been put off for far, far too long and cost me more than I would have expected in terms of the delay. I've caught up on finishing the kitchen cabinet baseboards, repainting most of the baseboards in the house, scrubbing the floors and cleaning out old grout, repainting/touching up the walls, and various other things. I've also been spending my days at a new potential job location and even traveled to Sebastian for a day trip to get involved with a property management project on Monday as my first official task, pics below. On Tuesday I attended a pre-audit as an opportunity to learn a bit more and participate in the process. Sometimes the small things have to be fixed before the bigger things can sink in, but I do have a certain optimism for the future; which right now is pretty much all I have. I'm a bit excited and saddened at the same time; excited for the opportunities that might be coming up soon and saddened for the things lost, even old free time, but it is indeed progress.


Monday, March 23, 2009
Does pirate software come with a treasure map?
Sunday, March 15, 2009
Every new project requires a tool that you don't have.
Today was a day of working on some home projects and catching up on overall tasks. Kristen decided to repaint the bird cage for Zoey and to pressure wash the bird stand while I worked on a few things. I finally got the backyard fence readjusted since a corner of it was over the property line and the neighbor behind the house recently decided to put up a privacy fence and thus needed to be moved, which was fine.

Sunday, February 22, 2009
Finally finished that dam project!
One of the neat features of the place my father got in Riverview was a creek running through the tail end of the property edge by the river and flowing under the boathouse. It had a flowing spring with a small cavern (I checked and could only squeeze in about 6 feet) right on the property line and just downstream of a dam the neighbor put up early last year. The creek and river are tidally influenced and would fill up and drain a few times a day. The irrigation pump had the intake in the creek and dad already once forgot to turn the pump off and sucked in air so the impeller had to be replaced. He decided to put in his own dam so to better increase the aesthetic value by having not only a constant bit of standing water, but also a waterfall effect as well.
We spent a while getting supplies and designing the dam and worked on it over several weeks. It was a tough, tough project where we had to dig into the banks a few feet and through the creek mud into the hard bottom so to build the foundation. After pouring the foundation and having it set, we came back in to put in the block to build up the rest of it. We had to wait until the early part of the year when there are the longest periods of time between the tides and were still always working against the clock. Finally after the blocks were poured, empty cells filled in with concrete and everything had cured, I had to go in to put in the limestone and slate pieces to create a more natural look. I already designed the dam so there was a 4 inch drain pipe, but I also put in a small 1/2 inch pipe, further reduced to just a small hole drilled into a cap pointing up, so that there would be a fountain effect whenever the tide was low, and a boiling look whenever it was high. Overall I am very pleased with how the project turned out. Whenever the rains return, I suspect there will be a fairly decent water flow through the spillway at times. I got it measured so that our spillway was just 2-3 inches below the spill way of the neighbor's dam so that there would be two flowing waterfalls during periods of high flow.










We spent a while getting supplies and designing the dam and worked on it over several weeks. It was a tough, tough project where we had to dig into the banks a few feet and through the creek mud into the hard bottom so to build the foundation. After pouring the foundation and having it set, we came back in to put in the block to build up the rest of it. We had to wait until the early part of the year when there are the longest periods of time between the tides and were still always working against the clock. Finally after the blocks were poured, empty cells filled in with concrete and everything had cured, I had to go in to put in the limestone and slate pieces to create a more natural look. I already designed the dam so there was a 4 inch drain pipe, but I also put in a small 1/2 inch pipe, further reduced to just a small hole drilled into a cap pointing up, so that there would be a fountain effect whenever the tide was low, and a boiling look whenever it was high. Overall I am very pleased with how the project turned out. Whenever the rains return, I suspect there will be a fairly decent water flow through the spillway at times. I got it measured so that our spillway was just 2-3 inches below the spill way of the neighbor's dam so that there would be two flowing waterfalls during periods of high flow.



Friday, November 14, 2008
Hot water heater? Why do you need to heat hot water?
After a good bit of research, I finally decided to install a solar water heater in the house. I had started to see signs of the water heater that was already about 20 years old (since they often have a life span of 15-20 years anyway). When I was in Australia last March, I noticed that most of the homes actually had a solar water heating system installed and being in a very sunny area of the country, it makes sense to use it. The local electric company is also looking to increase rates by 20-30% by the beginning of next year. I have 4 adults in my home and figure that heating the water is a fairly significant amount of my bill. A lot of the marketing estimates suggest thatMonday, August 25, 2008
In a hurricane, you can fly anything. Landing is the problem though.
I've been working a bit over at the Alafia River house on various projects for a few weeks. One of the bigger projects was the installation of a front driveway gate. We'd been searching Craig's List for a while and found a large gate in Sarasota that I picked up a month or so back and did the welding earlier in the month. It took a bit of calling, but found a metal supply place that had 6" square tubing to be used as a vertical support as well as online searches for the hinges that could take the weight.
After a lot of digging, concrete mixing, and leveling, we finally got it installed. Then we had to do the digging to install the code panel, egress button, and control box. The last bit was to bring out the generator and drill through 1/4" steel to install the necessary brackets before putting in the opener. After all the work, the gate has been installed with the last of the work involving just burying 800 feet of 12v cable to the nearest electrical outlet to install a transformer for the control unit.
While working on the gate Saturday, for whatever reason a seemingly healthy tree decided to give up the ghost and fell right onto the workshop. Tropical Storm/Hurricane Fay had brought in some rains, but there was almost no wind when the tree fell and it wasn't raining at the time, so I'm not sure what caused it. A large hole was punched through the ridge line as well as by the soffit. I had to go up to the roof and as it was raining cut apart enough of the tree so that I could put in a temporary tarp. Now the beginning of my week is spent cutting out the broken roofing, putting in new pieces, and reinstalling new shingles.
Sunday, August 03, 2008
Joan of Arc was the patron saint of welding.
For a few hours this ring dad and I worked in the garage of a few projects. A couple of weeks ago he had me pick up a large gate that we're going to install in the driveway at my father's place. It was a 16 foot gate, however we decided to cut off 13 feet in order to reduce weight and the necessity to cut out more of the wooded area since it was a bit overkill as is. We cut off one side followed by a short section and then had to weld beck on the side piece. Welding can be fun, but it is also a lot of work, scraping, welding, tapping, etc. We also picked up some 6"x6" metal post about 10 feet long to weld on the hinges.


Friday, June 27, 2008
Video arcade Christmas carol: "Chest guts roasting as I open fire..."
Dad came over to give me a hand in loading and as soon as that was done I had to get back to packing for the trip since I needed to head to the airport with Kristen by 3 o'clock. It was hard not to get a chance to play, but I'm sure there will be time later. I took a few pictures of the rest of the nearly completed room and took off to meet with Kristen at work. I think the place is finally starting to show some promise and come closer to what we've had in mind. there is still a lot of work to do from adding the chair molding to building the shelves behind the bar, but it is all getting closer.
The flights were fairly uneventful even though we almost got bumped in Denver on the way to Rapid City. We picked up the rental car and headed towards Deadwood/Lead and Terry Peak where Kristen's parents had rented a large place for a few days. The GPS worked perfectly in getting us exactly where we needed to be and it was quite nice to be able to drive in and finally get a chance to rest after having been up and constantly moving for the past 20 hours.
Subscribe to:
Posts (Atom)
